Monthly Archives: February 2015

Shale shaker screen manufacturers

Shale shaker screen may be a necessary a vicinity of mud system, that’s used wide in oil and gas drilling works. the thanks to install and right may be a necessary.

1 The screen square measure typically used alone or have two or plenty of combined inside

shale shaker screen manufacturers

shale shaker screen manufacturers

that suspension influx pipe manifolds square measure typically created keep with the users’desires.

2 The installation and replace of the screen artifact: Screen artifact could be a trendy carrying for this instrumentality, the quality of its installation will directly influence its service life. A bolt stretching device is adopted to repair the screen artefact.

3 The regulation of the screen box’s dip angle: once suspension discharging quantity is solely too teeming or escaping thanks to a much better body, the screen box’s dip angle need to be regulated. the foremost effective dip angle is that one preventing slurring from escaping. The screen box’s dip angle of the facility square measure typically discretionarily regulated by the values in conjunction with -1°, 0°, 1°, 2°, 3°, 4°, 5°. once adjusting, the oil come back valve of the pump need to be screwed down first of all and tightly. At constant time, gently press the manual rocker until the lifting slide bushing square measure about to be rising to alittle degree. By this step, have the pin drawn off with pressurizing finished manually. The movement of the hydraulic cylinder will modification screen box’s dip angle. once the regulation finishes, the facility will not resume its work until the bolt pin is inserted with oil come back valve unscrewed. whereas the screen is in its operation, the suspension need to cowl 3/4 of the screen artefact. If the coated house is not up to the standard, it shows that the screen mesh is solely too thick. And to spice up its purifying result the screen with skinny mesh ought to get replaced.

4 Fixing screen box throughout transportation: thus on forestall any injury throughout transportation, please remember: the lockup yoke need to be tightly barred in transportation, guaranteeing that there is no relative movement between screen box and pedestal. The lockup yoke need to be unsecured before its starting, otherwise, the machine square measure about to be seriously damaged.5 the maintenance on sieving medium:

The shaker screen need to be idly operated for 5~10min before stopping operation anytime and additionally the sieving medium need to be cleaned with clean water at constant time.

Brightway mud circulation system

For mud circulation system, we will use it in varied drilling operation. totally different|the various} well drilling conditions can request different mud circulation system.

Mud circulation system as well as mud tanks system, the mud method instrumentality,such as sedimentary rock shaker,desander,desilter,mud cleaner,decanter centrifuge,mud bad hat,shear pump and etc. All pipelines and electrical lines, cables, and every one accent components. like the ladders, hand rail, guard rail, etc.

mud circulation system

mud circulation system

Fluids system instrumentality primarily is sedimentary shale shaker, hydrocyclones desander,desilter, centrifuge bottle,centrifugal pumps, and mixers/agitators.

High quality field mud tank system should be fictitious below skilled configuration. The best proposal with high potency and low price. Cater to clients’ specific demand and actual drilling conditions.

All the equipments and tanks ought to be product of top quality staple and made in line with government normal. examine all instrumentality and field drilling fluid tanks fully and strictly. guarantee all pipes square measure connected with one another. All fastening line ought to be sealed and plain.

Actually, we want virtually fluid system embody shaker tank, active, vessel or compounding tank. Sometimes, there’ll be additionally the trip tank, pill tank, and swab or check tank.The mud tanks square measure completely different size or dimension. It depends on whole mud tanks system capability or flow mud pump rate of flow. Whole mud system as well as completely different phases and method steps. we want to calculate all data intimately.So sometimes the only mud tank effective volume or capability as well as 20m3 and fewer, 20-40m3, then 40-70m3. Their length may be 8m, 9m, 10m, 11m, 12m, 15m, etc.